Commissioning And Testing

Commissioning And Testing

This being an integral part of Project completion, AJ Technovation Undertake the following modules:

  • Third Party Design review
  • Factory Acceptance Testing
  • Site Acceptance Testing
  • Site visit and overall Quality Analysis and Quality Control Checks to ensure that the material on site is as per the quality and manufactured as per design intent and also site execution is as per the approved drawings.
  • Integration Testing with testing of failure scenarios on full load
  • Commissioning
  • Follow up for Snaglist completion
  • Training to Operation teams with handling over all Completion, Commissioning and Operation Manuals of equipment after review and Certifying as built Drawings , Clearing the final dues of all vendors before signing their Commissioning reports and Validating their Warranty certifcates